Username: Save?
Password:
Home Forum Links Search Login Register*
    News: Keep The TechnoWorldInc.com Community Clean: Read Guidelines Here.
Recent Updates
[October 17, 2024, 05:05:06 PM]

[October 17, 2024, 04:53:18 PM]

[October 17, 2024, 04:53:18 PM]

[October 17, 2024, 04:53:18 PM]

[October 17, 2024, 04:53:18 PM]

[September 09, 2024, 12:27:25 PM]

[September 09, 2024, 12:27:25 PM]

[September 09, 2024, 12:27:25 PM]

[September 09, 2024, 12:27:25 PM]

[August 10, 2024, 12:34:30 PM]

[August 10, 2024, 12:34:30 PM]

[August 10, 2024, 12:34:30 PM]

[August 10, 2024, 12:34:30 PM]
Subscriptions
Get Latest Tech Updates For Free!
Resources
   Travelikers
   Funistan
   PrettyGalz
   Techlap
   FreeThemes
   Videsta
   Glamistan
   BachatMela
   GlamGalz
   Techzug
   Vidsage
   Funzug
   WorldHostInc
   Funfani
   FilmyMama
   Uploaded.Tech
   MegaPixelShop
   Netens
   Funotic
   FreeJobsInc
   FilesPark
Participate in the fastest growing Technical Encyclopedia! This website is 100% Free. Please register or login using the login box above if you have already registered. You will need to be logged in to reply, make new topics and to access all the areas. Registration is free! Click Here To Register.
+ Techno World Inc - The Best Technical Encyclopedia Online! » Forum » THE TECHNO CLUB [ TECHNOWORLDINC.COM ] » Techno Articles » Internet
 Intranet Portal Project - RAD or Waterfall?
Pages: [1]   Go Down
  Print  
Author Topic: Intranet Portal Project - RAD or Waterfall?  (Read 506 times)
Shawn Tracer
TWI Hero
**********


Karma: 2
Offline Offline

Posts: 16072


View Profile
Intranet Portal Project - RAD or Waterfall?
« Posted: February 25, 2008, 10:55:33 AM »


Intranet Portal Project - RAD or Waterfall?
 by: David Viney

In this short article, David Viney examines whether Rapid Application Development (RAD) or Waterfall development methodologies should be used during Intranet Portal projects.

Building Bridges

I have often used the analogy of building a bridge to explain to business colleagues the difference between RAD and Waterfall.

Let’s say that we are in the middle ages and the Mayor of Kingston-upon-Thames is evaluating whether or not to build a bridge over the river to the north side, to replace the current ferry. The whole area has been growing rapidly and a bridge at Kingston should give his town a lead against competing local towns like Ham and Richmond (who also have their own ferries).

However, building a bridge presents problems. Firstly, the bedrock north and south of the river are very different. Secondly, the river is still tidal at this point and its path continues to vary across the floodplain. Finally – and perhaps most importantly – there is no guarantee that the projected growth in cross-river traffic will indeed materialise – or that people will wish to cross at this precise point, rather than further up, or down, river. A new bridge could prove an expensive white elephant and divert much-needed town resources away from other projects. The increased local taxes required could also scare the very businesses he is hoping to attract away to other local towns.

Option 1 - Waterfall

Waterfall, as a methodology, is all about building reliable systems. At each stage of the lifecycle, the results are correct. The Mayor’s engineer believes that - when building a bridge - the result needs to be safe, sound and capable of lasting for decades. He recommends a design phase, which includes thoroughly testing the bedrock by driving piles and developing ways to limit the future variance of the river’s course. During the build phase, the bridge would be tested to ensure it can take the loads that will be placed upon it and to deal with high winds or flood conditions. The engineer confirms that each stage would only start once the previous stage had been proved correct beyond reasonable doubt. The stone bridge will take five whole years to build (with a high upfront cost commitment). If the project were ever stopped, the value tied up in phases to date would be lost. The engineer reminds the Mayor that a collapsed bridge would not help his place in history!

Option 2 - RAD

RAD, as a methodology is all about building relevant systems. The argument runs that it is better to be there quickly with 80% of the functionality in 20% of the time, so as to take full advantage of the business opportunity. The Mayor’s political advisors recommend the RAD option; to lay a pontoon bridge first alongside the existing ferry. This can be achieved in just three months, using a series of boats with a makeshift road surface and swing bridge lock for river vessels to navigate. The pontoon bridge allows the business model to be tested very quickly; If the expected benefits materialise, then further iterations of the bridge can be constructed later on. Sounds good, but of course (overall) the costs will be higher than waterfall if a full, stone bridge is ultimately required. In the meantime, if the river changes course, or floods impact the area, then the pontoon bridge will be washed away. His chief advisor reminds him that a bridge five years from now would not help his re-election prospects two years hence!

The Mayor’s selected option

Hmm. Interesting, isn’t it. Not a clear-cut decision. There are good arguments for either approach. The Mayor’s decision will ultimately depend on (a) how sure he is of his own vision, (b) his financial and time constraints and (c) how changeable these factors are likely to be over time. In short, he has a trade-off decision of relevance vs. reliability.

Turning the analogy onto Intranet Projects

In chapter 16 of my Intranet Portal Guide (see http://www.viney.com/DFV/intranet_portal_guide/during/development_methodology.html), I explore these concepts in a bit more depth.

However – put simply – the answer for you will depend largely on how sure you are of your vision, the support of stakeholders, the availability of resources and the degree of change in your organisation and it’s requirements.

If you are operating in a stable business environment and are well funded and supported, then waterfall offers real benefits. You could establish an Intranet Portal that is well founded, scalable and secure. If not, then RAD could offer you the means to make some progress now at low cost and use the results of your early work to build a stronger case for future investment. It also allows you to vary the approach – or begin again – should circumstances or requirements change.

Most Intranet evangelists will find themselves perhaps in a mixed situation, where there is support and funding but there is also the risk of rapid changes to the underlying business environment and requirements. Here, I would recommend a mixed approach: Use a waterfall project to establish the underlying portal infrastructure (as this platform will be the bedrock on which you will build and needs to stand the test of time). Then use a RAD method to build the content and applications (developing solutions that are timely and relevant to businesses operating in a fast-moving and competitive environment).

About The Author

David Viney ([email protected]) is the author of the Intranet Portal Guide; 31 pages of advice, tools and downloads covering the period before, during and after an Intranet Portal implementation.

Read the guide at http://www.viney.com/DFV/intranet_portal_guide or the Intranet Watch Blog at http://www.viney.com/intranet_watch.

Logged

Pages: [1]   Go Up
  Print  
 
Jump to:  

Copyright © 2006-2023 TechnoWorldInc.com. All Rights Reserved. Privacy Policy | Disclaimer
Page created in 0.086 seconds with 24 queries.