Username: Save?
Password:
Home Forum Links Search Login Register*
    News: Keep The TechnoWorldInc.com Community Clean: Read Guidelines Here.
Recent Updates
[September 09, 2024, 12:27:25 PM]

[September 09, 2024, 12:27:25 PM]

[September 09, 2024, 12:27:25 PM]

[September 09, 2024, 12:27:25 PM]

[August 10, 2024, 12:34:30 PM]

[August 10, 2024, 12:34:30 PM]

[August 10, 2024, 12:34:30 PM]

[August 10, 2024, 12:34:30 PM]

[July 05, 2024, 02:11:09 PM]

[July 05, 2024, 02:11:09 PM]

[July 05, 2024, 02:11:09 PM]

[June 21, 2024, 01:43:48 PM]

[June 21, 2024, 01:43:48 PM]
Subscriptions
Get Latest Tech Updates For Free!
Resources
   Travelikers
   Funistan
   PrettyGalz
   Techlap
   FreeThemes
   Videsta
   Glamistan
   BachatMela
   GlamGalz
   Techzug
   Vidsage
   Funzug
   WorldHostInc
   Funfani
   FilmyMama
   Uploaded.Tech
   MegaPixelShop
   Netens
   Funotic
   FreeJobsInc
   FilesPark
Participate in the fastest growing Technical Encyclopedia! This website is 100% Free. Please register or login using the login box above if you have already registered. You will need to be logged in to reply, make new topics and to access all the areas. Registration is free! Click Here To Register.
+ Techno World Inc - The Best Technical Encyclopedia Online! » Forum » THE TECHNO CLUB [ TECHNOWORLDINC.COM ] » Techno Articles » Management
  How To Recognize Bottlenecks In Six Sigma Implementation
Pages: [1]   Go Down
  Print  
Author Topic: How To Recognize Bottlenecks In Six Sigma Implementation  (Read 535 times)
Daniel Franklin
TWI Hero
**********


Karma: 3
Offline Offline

Posts: 16647


View Profile Email
How To Recognize Bottlenecks In Six Sigma Implementation
« Posted: November 07, 2007, 03:34:03 PM »


Identifying Six Sigma roadblocks and bottlenecks is essential for eliminating them for effective deployment and to reap the benefits of applying advanced versions of Six Sigma for higher productivity. Of late, Six Sigma professionals are increasingly identifying bottlenecks. The dawning of the reality that the voice of the customer is a ‘moving target’ has posed challenges in the face of growing competition. But this is not to say that there are no bottlenecks on the implementation side.

Six Sigma Bottlenecks

One major bottleneck in Six Sigma deployment can be attributed to errors in decision making which invariably leads to higher COPQ. The bottlenecks are critically different for small and companies from large corporations because of their contextual differences. Further, they may result from any or all phases of the deployment process.

Bottlenecks In Low Cost Deployments: Often, small and medium sized companies take to Six Sigma circles with limited resources and as a consequence, expose themselves to additional limitations.

• Owing to resource limitations, human and financial, more personnel are often found working overtime

• Difficulty in hiring the Belts on a full-time basis due to reasons other than financial; for example, uncertainties including the commitment to deployment

• Question of survival of the business owing to lack of innovativeness in product or service development and introduction to the market

• Procrastinating over decision-making on capital expenditures even against justified ROI projections

The above roadblocks result in problems such as:

• Non-availability of methods and tools required for efficient and timely Six Sigma deployment

• Risk of generating outdated, irrelevant and incompetent solutions for re/design and development of product or service

• Prolongation of project cycle time

• Expensive errors at the early stages triggering a series of multiple errors

Overview of Bottlenecks Arising From Deployment Phases

Poor selection of projects is often found to be the biggest stumbling block. Let’s take a critical look at this:

Define Phase

o Lack of options for potential changes or innovation

o Underestimation of subsequent secondary problems

o Lack of failure analysis

o Unclear definition of alternative causes and effects

o Failures due to wrong direction and narrowing of scope

Measure Phase

o Variability of measurement or lack of measurement systems

o Time lost in data collection

Improvement or Design Phase

o Shortcomings in innovative design improvement ideas

o Unjustified consumption of DOE by labor and time

Control or Verification Phase

Failure to simulate design and prototype against the ‘voice of customer’ resulting in poor and non-exhaustive failure projections and profiles can be mostly expected in this phase.

What immediately gets affected by the bottlenecks are not just time losses but a newfound increase of COPQ. Other pitfalls include repetitive idea and data collection, never-ending discussions and meetings and examining alternatives that significantly hamper the outcome. All of these factors sometimes push the Six Sigma methodology to the threat of losing support for future deployment plans. Error removal, even if not routine, must be practiced inherently.

Tony Jacowski is a quality analyst for The MBA Journal. Aveta Solutions – Six Sigma Online ( http://www.sixsigmaonline.org ) offers online six sigma training and certification classes for lean six sigma, black belts, green belts, and yellow belts.

Article Source: http://EzineArticles.com/?expert=Tony_Jacowski

Logged

Pages: [1]   Go Up
  Print  
 
Jump to:  

Copyright © 2006-2023 TechnoWorldInc.com. All Rights Reserved. Privacy Policy | Disclaimer
Page created in 0.284 seconds with 24 queries.